Oct 25 update
After finishing the under floor heating installation, the system was fired up and left to run for a week, nicely drying out all the cement floors.
the living room floor has been raised now (as has the whole house) by 12 cms to accomodate the uner floor heating and various layers above and below such. Fortunately with 5 metre ceilings the impact is non-existent.
the passageway roof is ripped off, and soon too those ugly aluminium window frames will go
the master bedroom dressing room and bathroom start to take shape
looking down the hall to the second bathroom
another skylight is added to the ceiling of the second bedroom
the laundry door gets put in
and an access to the loft study is made, awaiting the balcony and stairs to be installed